cold.fyi / How a City Works / Where your tap water comes from

Section 03 of 26 · about 13 min read · updated October 2026

03Where your tap water comes from

The short version: City water starts as rain on a protected watershed or in a river, passes through a treatment plant, and travels through buried tunnels and mains to the tap, pushed by gravity, pumps or both. Pressure comes from height: every foot of water standing above a faucet adds about 0.433 psi.101 Greater Boston drinks from two forested reservoirs in central Massachusetts and is one of five major US systems with a waiver to skip filtration.102103 The weak points are the pipes themselves: tunnels with no backup, and lead service lines that a federal rule, now being challenged in court, requires most US utilities to replace by the end of 2037.67104

Where does city water come from?

Every piped water supply is a chain of four links: a source (a reservoir, river, lake or aquifer), treatment, a distribution network of mains and service pipes, and storage that keeps pressure steady when demand swings. A failure in any one link reaches the tap.

The source is usually defined by its watershed: the land that drains rain and snowmelt into a particular river or reservoir. A utility that owns or controls a clean watershed starts with cleaner water, and some of the oldest big-city systems were built around that idea.

Greater Boston's supply is a clear example. The Quabbin Reservoir holds 412 billion gallons (about 1.56 billion cubic meters) and the Wachusett Reservoir holds 65 billion gallons, for 477 billion gallons of combined source storage.102 More than 85% of the land in the two watersheds is forest and wetland, and the watersheds are tested and patrolled.105 Two older reservoirs, the Sudbury Reservoir and Framingham Reservoir #3, are kept as backup and hold another 7.7 billion gallons.102

New York City works on a similar plan at a larger scale. Its Catskill and Delaware supplies come from six reservoirs west of the Hudson River and serve more than 9.5 million people.103

The number that matters most for a reservoir system is safe yield: how much water the supply can deliver every day, reliably, through a long drought. For the Massachusetts Water Resources Authority (MWRA), which runs Greater Boston's wholesale system, safe yield is about 300 million gallons per day (mgd), or about 1.1 million cubic meters.102 Average demand was 194.3 mgd in 2023 and 201.2 mgd in 2024 (a preliminary figure).102

Diagram 2 · Reservoir to faucet
Quabbin412 billion galWachusett65 billion galCarroll plantMarlboroughCovered storageand city tunnelsStreet mainTapDeep rock tunnels carry water east to the metro areaHeight is pressure: about 0.433 psi for every foot of water above the tapNot to scale. MWRA system shown; sources: MWRA (reservoir volumes, Carroll plant).

Why do some big cities skip filtration?

Most surface-water systems run their water through a sequence of chemical and physical steps that clump fine particles together, let them settle, and filter what is left.

Concord, New Hampshire, which draws from Penacook Lake, describes a typical sequence. A coagulant is added to make particles stick together into floc; the water is mixed fast, then gently, so the floc grows (flocculation); it slows in a sedimentation basin so the heavy clusters settle and are scraped away; and it then passes down through a 3-foot filter of silica sand and granular activated carbon.106 Chlorine and then chloramine are added afterward for disinfection.106

A few cities with exceptionally protected sources are legally allowed to skip the filter. The Natural Resources Defense Council (NRDC) counts five major US systems with these filtration waivers: New York, Seattle, Portland (Oregon), San Francisco and Boston.103 New York's current waiver was issued by the New York State Health Department in December 2017 and is scheduled to last until 2027.103

In our reading, "filtration avoidance" is a regulatory status, not a loophole. A utility keeps it by keeping its watershed clean, through land purchases, patrols and limits on development, and by proving it with water testing.

Boston's waiver was fought over in court. On February 12, 1998, the US government sued MWRA and the Metropolitan District Commission to require filtration under the Safe Drinking Water Act.107 On May 5, 2000, the federal district court declined to order filtration and accepted MWRA's ozone-based plan instead; the court put the cost of a filtration plant at about $180 million.107 The First Circuit Court of Appeals affirmed that ruling on July 16, 2001.107 The idea was not new: when the Quabbin was built, it was described as a pure upland supply, delivered by gravity, that would "not require filtration."108

What actually happens at the treatment plant?

Since July 2005, metro Boston's water has been treated at the John J. Carroll Water Treatment Plant in Marlborough.105 It was designed for an average of 275 mgd and a peak of 405 mgd.105 The steps, in order:105

Step Chemical or process What it does
Primary disinfection Ozone gas, 1.5 to 4.0 mg/L Kills microbes, including 99% of Cryptosporidium (2-log) and 99.9% of Giardia (3-log)
Ozone removal Sodium bisulfite Removes leftover ozone
Second disinfection Ultraviolet (UV) light, added April 2014 Added to meet EPA's LT2 rule on Cryptosporidium
Residual disinfectant Sodium hypochlorite plus aqueous ammonia Forms monochloramine, which keeps working as water travels through miles of pipe
Fluoridation Hydrofluorosilicic acid, 0.7 mg/L Adds fluoride
Corrosion control Sodium carbonate plus carbon dioxide Raises pH and alkalinity so the water dissolves less lead and copper from old plumbing

The last step is easy to overlook and arguably matters most to anyone living in an old building. Corrosion control means tuning the water's chemistry so it does not eat the metal it travels through.105

Fluoridation is a policy decision as much as a treatment step, and it has become contested in parts of the US.

In 2025, Utah (HB 81, enacted in March) and Florida (SB 700, signed by Governor Ron DeSantis in May) passed laws barring local water systems from adding fluoride.109 In April 2025, Kennedy said he would tell CDC to stop recommending community water fluoridation and would assemble a task force to study the issue; as the Associated Press noted, states and localities make their own fluoridation decisions.110 The same month, EPA said it would review new scientific information on fluoride to inform a possible revision of its drinking water limit, now a maximum contaminant level of 4.0 mg/L.111 A Congressional Research Service report dated May 16, 2025 found no official HHS statement on the change yet, and said the Community Preventive Services Task Force's 2013 recommendation remained its most current.111 On May 13, 2025, HHS announced that FDA was moving to remove concentrated ingestible fluoride prescription products for children from the market; HHS Secretary Robert F. Kennedy Jr. called ending ingestible fluoride "long overdue."112 CDC's published recommendation, last reviewed in May 2024, remains community water fluoridation at 0.7 mg/L, the level the US Public Health Service set to balance benefits against potential harms.113

How does water get from the reservoir to your faucet?

Much of the work is done by gravity. MWRA's Quabbin Tunnel runs in both directions: in high-water months it carries surplus Ware River flow west into the Quabbin, and at other times it carries water east.108 Its eastern section, the Wachusett-Colebrook Tunnel, was begun in 1926.108

Closer to the city, the MetroWest Water Supply Tunnel runs 17.6 miles (28 km) from Marlborough to Weston, parallel to the Massachusetts Turnpike.114 It was mined 16 feet (4.9 m) across, finished at 14 feet, and lies 200 to 500 feet (60 to 150 m) underground.114 It went into service in November 2003 at an estimated $665 million, under its 1995 budget of $728 million, and it was built to back up a single aqueduct from the 1940s, the Hultman.114 Inside the metro area, the City Tunnel, City Tunnel Extension and Dorchester Tunnel carry about 60% of daily demand.67 MWRA also keeps 282.7 million gallons in covered distribution storage.102

From the tunnels, water moves into local mains run by each city or town, then through a service line, the pipe that connects a building to the main under the street.

Pressure follows from height. Each foot of water standing above a point adds about 0.433 pounds per square inch (psi) of pressure there, or roughly 9.8 kilopascals per meter.101 Our arithmetic: a water surface 100 feet (30 m) above a faucet delivers about 43 psi before friction losses; 200 feet delivers about 87 psi. That is why reservoirs sit on high ground, why gravity systems were the first choice for 19th- and early 20th-century engineers, and why pumping is needed wherever the source is too low (or the faucet too high; see Why water reaches the 40th floor).

Why are water towers so high?

The same arithmetic explains the water tower. A tower or standpipe is a reservoir lifted into the air: the height of its water surface sets the pressure in the mains around it. Utilities can pump water up when demand is low and let it flow down when everyone showers at once, and the stored water is there for firefighting.

A 2001 technical brief from the National Drinking Water Clearinghouse at West Virginia University lists the same roles: storage lets a utility pump at the average rather than the peak rate, holds a reserve for firefighting and other emergencies, and keeps pressure uniform.115 Tanks are drawn down during peak hours and refilled when demand is lowest, late at night and early in the morning.115 The brief gives minimum acceptable system pressures of 35 to 40 psi, with maximums generally 100 to 120 psi.115

Why do water mains break?

Pipes age, the ground shifts and freezes, and sudden pressure changes stress joints. When a small main breaks, a street floods and a few blocks lose water. When a trunk line fails, a whole region can lose it.

Greater Boston learned this in May 2010, when a water main break made clear that the tunnels carrying 60% of metro demand had no backup.67 MWRA's response is the Metropolitan Water Tunnel Program, which adds about 15 miles (24 km) of deep rock tunnel: a 4.8-mile Northern Tunnel and a 10-mile Southern Tunnel, each 10 to 12 feet across and 200 to 450 feet deep.67 The estimated cost is $2.1 billion (in MWRA's proposed FY25 capital plan), with construction planned for about 2027 to 2040.67

Redundancy is the recurring theme of modern water engineering in old cities. The MetroWest tunnel backed up a single aqueduct; the new tunnels back up the city tunnels. A system with one path is one bad coupling away from a regional emergency.

How often do mains break nationally? A Utah State University study of 802 utilities in the US and Canada, dated December 2023, found 11.1 breaks per 100 miles of pipe per year, down about 20% from 14.0 in its 2018 study; cast iron failed most often, at 28.6 breaks per 100 miles.116 Utilities also hunt for leaks before they become breaks. Leaking water makes the pipe vibrate, and crews listen at valves and hydrants or through the ground with sensors and microphones; a correlator times when the sound reaches two sensors on either side of a suspected leak to estimate where it is.117

Are there still lead pipes, and who has to replace them?

Yes. EPA estimates that "up to 9 million homes" in the US are still served by them.118 Treatment plants adjust water chemistry to reduce how much lead and copper leaches out of old plumbing, which is the corrosion control step described above.105

Flint, Michigan, shows what happens when that step is skipped. On April 25, 2014, the city switched from the Detroit system to the Flint River to save money, and it did not add the anti-corrosion treatment that builds a protective scale inside old pipes, so lead leached into the water.119 Flint was switched back to Detroit water in October 2015.119

On October 8, 2024, EPA announced the Lead and Copper Rule Improvements (LCRI).118 Its main terms, as of October 2026:

  • Most US water systems must replace lead service lines, and lines of unknown material, within 10 years; systems with a high share of lead lines may get more time.118
  • The action level, the lead concentration that triggers required steps by a utility, drops from 15 to 10 micrograms per liter (parts per billion).118
  • The baseline inventory and replacement plan are due November 1, 2027, when mandatory replacement begins.104
  • The required average replacement rate of 10% a year is measured from December 31, 2030, and replacement must be complete by December 31, 2037.104
  • Partial replacements, where only the utility's section of a line is swapped, are banned from November 1, 2027, except during emergency repairs.104
  • The Bipartisan Infrastructure Law provided $15 billion over five years for lead line work.118

The rule is being challenged in court; see "What's changing now" below.

In Boston

Greater Boston's water system is a two-level arrangement. MWRA is the wholesaler: it owns the reservoirs, tunnels and treatment plant and sells water to cities and towns, which run their own local pipes. MWRA describes its reach two ways on the same web page, as "2.5 million people in 53 communities" and as "over 3.1 million customers in 61 communities."67

The system is notable for using less water than it did a generation ago. Withdrawals ran above safe yield in the 1980s, and after MWRA started a conservation program in 1986, they dropped below safe yield by 1989.102 Demand was about 200 mgd in 2024, well under the Carroll plant's 275 mgd design average.105

Dry years still register. MWRA has listed the Quabbin in "Below Normal" drought status since February 2026, and it remained there as of June 1, 2026.102 With 477 billion gallons in storage and demand around 200 mgd, our arithmetic says the reservoirs hold several years of supply, which is why a "Below Normal" listing is a watch status rather than an emergency.

On lead, MWRA's corrosion control is the regional defense.105 Replacing the pipes themselves is up to the local water departments.

In Boston, the Boston Water and Sewer Commission (BWSC) replaces the private section of a lead service line, from the property line into the building, "at no cost to the owner" for eligible properties.120 It began covering that cost in August 2023, using federal Bipartisan Infrastructure Law money.121 As of March 2024, BWSC had identified roughly 3,000 lead lines, said there might be thousands more, and only about 400 owners had used the free program.122 We did not find a BWSC target date for finishing.

How it changed

US city water started with gravity. New York's Croton Aqueduct, opened in 1842, fed reservoirs that sat about 60 feet above the city.49

Boston built its supply westward in stages. Work on the Wachusett-Colebrook Tunnel began in 1926.108 Construction of the Quabbin began in 1936, by damming the Swift River.108 To make room for it, the towns of Dana, Enfield, Greenwich and Prescott were disincorporated at midnight on April 28, 1938, under legislation passed in 1927.123 About 2,500 residents were displaced, and about 7,600 graves were moved to Quabbin Park Cemetery in Ware.123

Filling began on August 14, 1939, by MWRA's account (Mass Humanities says July 193930), and finished in 1946, when water first flowed over the spillway; at completion it was described as "the largest man-made reservoir in the world devoted solely to water supply."108 (The longer story of how cities came to build systems like this is in How cities came to need infrastructure.)

The late 20th century brought regulation and conservation. MWRA took over Greater Boston's water and sewer systems in 1985.124 Its conservation program began in 1986.102 The filtration lawsuit ran from 1998 to 2001, and the Carroll plant opened in 2005, with UV added in 2014.107105 The MetroWest tunnel followed in 2003, and the 2010 break started the next round of tunnel building.11467

What's changing now (2026)

  • The lead rule is in court. Water utilities led by the American Water Works Association (AWWA) have challenged the LCRI in the D.C. Circuit.125 NRDC intervened on December 20, 2024; final briefs, including EPA's defense of the rule, were filed April 17, 2026; and oral argument was held September 30, 2026.125 A decision is expected about 6 to 12 months after argument.125 A Tennessee state guide to the rule, published in May 2026, notes that its guidance "may change pending EPA rule updates."104
  • New York's waiver runs to 2027. The current filtration waiver for the Catskill and Delaware supplies is scheduled to last until 2027, so a renewal decision is approaching.103
  • Boston's backup tunnels are about to start. Construction of MWRA's Northern and Southern tunnels is planned to begin around 2027.67
  • Drought watch. The Quabbin has been in "Below Normal" drought status since February 2026.102

Report an error in this section

Quick answers

Is Boston's tap water filtered?

No. MWRA is one of five large US systems, with New York, Seattle, Portland (Oregon) and San Francisco, that operate without filtration because their watersheds are protected. A federal court accepted MWRA's ozone-based treatment instead of filtration in 2000, and the First Circuit affirmed in 2001; the Carroll plant now disinfects with ozone and UV, then adds chloramine.

Where does Boston's drinking water come from?

From the Quabbin and Wachusett reservoirs in central and western Massachusetts, which together hold 477 billion gallons. Water flows east through deep rock tunnels to the Carroll treatment plant in Marlborough and on to the metro area.

When do lead pipes have to be replaced in the US?

Under EPA's Lead and Copper Rule Improvements, announced in October 2024, mandatory replacement begins November 1, 2027, and most systems must finish by December 31, 2037. Water utilities have challenged the rule in the D.C. Circuit; oral argument was held September 30, 2026.

Sources for this section

28 of the guide's 398 sources. Numbers match the full reference list.

  1. Mass Moments (Mass Humanities): Quabbin Reservoir Filled to the Brim - massmoments.org ↩↩↩↩↩

  2. Vital City: New York's Wooden Water Tanks - vitalcitynyc.org ↩↩↩↩↩↩↩↩↩↩↩↩↩↩↩↩↩

  3. MWRA: Metropolitan Water Tunnel Program - mwra.com ↩↩↩↩↩↩↩↩↩↩↩↩

  4. PHCP Pros: High-rise plumbing design and plumbing codes - phcppros.com ↩↩↩↩↩↩↩↩↩

  5. MWRA: Reservoirs & Watersheds - mwra.com ↩↩↩↩↩↩↩↩↩↩↩

  6. NRDC: New Filtration Waiver Poses Challenges for NYC Water Supply - nrdc.org ↩↩↩↩↩

  7. Tennessee Department of Environment and Conservation: LCRI Quick Guide - Service Line Replacements - tn.gov ↩↩↩↩↩

  8. MWRA: John J. Carroll Water Treatment Plant - mwra.com ↩↩↩↩↩↩↩↩↩↩

  9. City of Concord, NH: Water Treatment - concordnh.gov ↩↩

  10. FindLaw: United States v. MWRA, 256 F.3d 36 (1st Cir. 2001) - caselaw.findlaw.com ↩↩↩↩

  11. MWRA: Water System History - mwra.com ↩↩↩↩↩↩↩

  12. MultiState: States Move to Ban Water Fluoridation (Utah and Florida Enacted Laws in 2025) - multistate.us ↩

  13. Boston.com (Associated Press): Water fluoridation, long considered a public health success story, under scrutiny (April 9, 2025) - boston.com ↩

  14. Congressional Research Service (via EveryCRSReport): The Development of Federal Recommendations and Regulations for Fluoride in Drinking Water (R48539, May 16, 2025) - everycrsreport.com ↩↩

  15. US Department of Health and Human Services: FDA Begins Action to Remove Ingestible Fluoride Prescription Drug Products for Children from the Market - hhs.gov ↩

  16. CDC: Community Water Fluoridation Recommendations - cdc.gov ↩

  17. MWRA: The MetroWest Water Supply Tunnel - mwra.com ↩↩↩↩

  18. National Drinking Water Clearinghouse, West Virginia University: Reservoirs, Towers, and Tanks - Drinking Water Storage Facilities (Tech Brief, 2001) - actat.wvu.edu ↩↩↩

  19. ASCE Civil Engineering: Breaking water mains present US, Canada with $452B problem - asce.org ↩

  20. Southwest Florida Water Management District: With One Ear To the Ground - swfwmd.state.fl.us ↩

  21. Brownstein: Leading the Way: New EPA Rule Gives 10 Years to Replace Lead Drinking Water Service Lines - bhfs.com ↩↩↩↩↩

  22. Global News: What happened to... Flint Michigan water crisis - globalnews.ca ↩↩

  23. Boston Water and Sewer Commission: Lead Replacement Incentive Program - bwsc.org ↩

  24. Boston Water and Sewer Commission: BWSC Announces Free Lead Pipe Replacement for Boston Property Owners - bwsc.org ↩

  25. Harvard T.H. Chan School of Public Health: Lead pipe replacement free in Boston, but uptake slow - hsph.harvard.edu ↩

  26. American Ancestors / Vita Brevis: Lost Towns of the Quabbin - vitabrevis.americanancestors.org ↩↩

  27. MWRA: Boston Harbor Project - mwra.com ↩↩↩↩↩↩↩↩↩↩↩↩

  28. NRDC: American Water Works Association v. EPA (Lead and Copper Rule Improvements) - nrdc.org ↩↩↩

Contents